Some of Our Work

 
Tel: 0151 648 8783
Mobile: 07794 733216
Email: themobilehandyman@yahoo.com

 

 

 

 

Left Hand Picture

is a bespoke fully hand made traditional wardrobe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Feature Insert Designed and hand made by us that replaced an existing wall mounted gas fire, note the use of glass blocks and feature lighting in its construction

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Replaced Existing Leaking Flat Roof Above this Bay Window, Constructed a New Timber Frame with Rosemary Tiles and Lead Flashing Detail.

New facia boards were added, guttering and downpipe.

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Taken before installation of a Bullnosed feature to the bottom stair tread

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Removal of corner damage to tread and existing hardboard riser trim.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Grooves where cut for biscuits to join new timber

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Hand Made and Shaped Bullnose is now offered up to the existing stair tread and further timber formers are positioned prior to completion.

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Completed Bullnose assembly prior to decoration 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Completed Bullnose assembly prior to decoration 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Rear View and Detail

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture: Before

Picture of a Porch Area Ceiling with exposed roofing timbers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture: After

Tongue and Groove Cladding was added, along with a new Light Fitting.

Work Undertaken During a 1 day Repair and Makeover.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture (before)

Prior to a new Ceiling, Plastering and full kitchen Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture (before)

Existing Suspended Ceiling was removed to make way for a newly constructed timber frame with plaster Finish and feature lighting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Newly Plastered Ceiling with Inset and feature Lighting, Extractor externally Vented and Walls now ready for Tiling.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture (after)

Installation of new cabinets

Sink and Plumbing, Tiling,  and new work surfaces.

Complete with new oven, hob and extractor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

8th May 2008

Traditionally Styled Hand Made Gate, Constructed on Site from Selected Redwood.

Gate Sanded Ready for Finish Coat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Rear View

Prior to Final Finish

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Satin Finish Coats Applied

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Left Hand Picture

Rear View

 

 

 

 

 

 

 

 

Made with Namu6